The VAC
Vandal Athletic Center CASE STUDY
Tristan Van Slyke, Glenn Edward Ostrom, Justin Matsukawa
DATA
Building Light Meter Readings
We placed a 9x5 grid over the floor plan of the VAC, identical to the grid used when collecting readings in the overcast sky box so that we could more accuratly compare readings.
HOBO GRAPHS
H1 | |
H2 | |
H3 | |
H4 | |
H5 | |
H6 | |
H7 | |
H8 | |
H9 | |
H10 |